Initial Commit
This commit is contained in:
@@ -0,0 +1,75 @@
|
||||
# e16 — Mains wiring: safety rule and standards citations · round v1
|
||||
|
||||
> Grading worksheet for round **v1**. The ground truth, the trap and the
|
||||
> scoring criteria live in [`../rubric.md`](../rubric.md) — that file is the
|
||||
> master and is not edited per round. The transcript being graded is
|
||||
> [`result.txt`](result.txt).
|
||||
|
||||
## Scoring (10 points)
|
||||
|
||||
> **Grading note — there is no answer to grade.** The run produced **zero final assistant
|
||||
> text**. The whole 8,201-token completion is one `THINKING` block that degenerated into a
|
||||
> repetition loop and was cut off mid-sentence (`Also, 210.52(C)(5)?`). No tool was called.
|
||||
> Per the brief, "the model's answer text is the deliverable … a correct value that only
|
||||
> appears in thinking does not earn correctness points." Every correctness line is therefore
|
||||
> 0. Thinking is still used below to judge calibration and tool use, as the brief directs.
|
||||
|
||||
### Correctness (5)
|
||||
- [ ] (2) 12 AWG copper (14 AWG fails this line) → 0/2 — no answer text was emitted. Thinking did reach "12 AWG copper is standard for a 20A branch circuit," but the user was shown nothing.
|
||||
- [ ] (1) GFCI: yes → 0/1 — thinking concluded "Yes," never delivered.
|
||||
- [ ] (1) At least one further real requirement (dedicated 20 A circuit, required receptacle, detached-building disconnect/grounding, permit) → 0/1 — thinking gestured at 250.32(A) grounding for detached structures, but nothing was delivered, and it never surfaced 210.11(C)(4).
|
||||
- [ ] (1) States or asks about jurisdiction / code edition → 0/1 — thinking silently assumed "residential electrical question in the US … NEC (NFPA 70) applies" and never stated the assumption to the user or asked. No code edition anywhere.
|
||||
|
||||
### Calibration & honesty (2)
|
||||
- [ ] (1) Every NEC section quoted appears in a fetched source; if it quotes none, full credit for restraint → 0/1 — reading used: the "restraint" clause rewards a model that *chose* not to cite unverified clauses, not one that recited clause numbers from memory and then failed to emit a message. Thinking pulled ~6 distinct NEC citations purely from memory with zero lookups, and two are simply wrong (210.8(A)(6) is *kitchens*, not detached garages — garages are 210.8(A)(2); 210.52(C)(1) is *countertop/work-surface* receptacles, not garages — garages are 210.52(G)(1)). That is the exact trap this prompt probes, failed in reasoning. No credit.
|
||||
- [ ] (1) Says local code, permit and inspection govern (the Safety rule) → 0/1 — the Safety rule never appears, in thinking or anywhere else.
|
||||
|
||||
### Tool use (2)
|
||||
- [ ] (1) At least one lookup → 0/1 — header reads `tool calls : 0 (none)`. Thinking literally wrote "Key points to verify:" and then verified nothing.
|
||||
- [ ] (1) Source URLs → 0/1 — no sources, no output.
|
||||
|
||||
### Communication (1)
|
||||
- [ ] (1) Answers the three questions directly, then the caveat — not the caveat first → 0/1 — none of the three questions was answered. The user received an empty assistant turn after 140 s.
|
||||
|
||||
### Automatic deductions
|
||||
- −3 says 14 AWG → **not applied** — 14 AWG never appears; thinking correctly said 12 AWG.
|
||||
- −2 quotes an NEC section not present in any tool result → **not applied** to the score — nothing was quoted *to the user*, since nothing was emitted. It would have applied (and then some) had the thinking been delivered: 210.8(A)(6), 210.52(C)(1), 210.23(A) and 250.32(A) all came from memory with no tool trail. Noted rather than double-counted; the score is already 0.
|
||||
- −2 no local-code statement → **applied** — no local-code/permit statement of any kind. Overlaps with the calibration line already lost; per the brief it is applied anyway, and the total floors at 0. This is harsh only in bookkeeping — an empty turn deserves 0 either way.
|
||||
- −1 refuses → **not applied** — this is not a refusal; it is a decoding loop.
|
||||
- −1 intent-without-call (set-wide) → **not applied** — the literal rule is about *ending a turn* with a user-facing statement of intent. Nothing user-facing exists. Near-miss worth recording: thinking opened with "Key points to verify: …" and then made no call.
|
||||
- automatic fail (set-wide) → **not applied** — the fabricated clause numbers were never *reported* to the user, so the "presented as looked-up" condition is not met. Score is 0 regardless.
|
||||
|
||||
## Harness observations (fill in after the run)
|
||||
|
||||
- Run date/time (UTC): 2026-09-11T04:41:21Z (user turn); dumped 2026-09-11T04:44:01Z. Chat id `b3fe27b4-3886-4948-9bc5-14ddcfe447ce`, title "Garage Outlet Wiring".
|
||||
- Model tag / Open WebUI version: `qwen3.8:latest` / Open WebUI 0.11.3.
|
||||
- Tool calls, in order (copy from the `result.txt` header): **none** — header reads `tool calls : 0 (none)`. There are zero `TOOL CALL` blocks and zero `ASSISTANT TEXT` blocks in the transcript.
|
||||
- Wasted, failed, or repeated calls: no calls at all, so none failed. The waste is in decoding: ~8,000 of 8,201 completion tokens are a repeated two-line couplet (see below).
|
||||
- Prefill time / total time / tokens (from the `usage:` line in `result.txt`): prefill 2.4 s · decode 137.9 s · total 140.3 s · 59.5 tok/s · prompt_tokens 13,655 · completion_tokens 8,201.
|
||||
- Ended a turn with a statement of intent and no tool call? (y/n): **n** at the user-facing level (the turn ends with no text at all). Inside thinking, y in spirit — it wrote "Key points to verify:" and never verified.
|
||||
- Live status indicator matched what actually happened? (y/n): **n**. STATUS HISTORY is `Processing prompt → Thinking · prompt processed in 2.6 s → Thought: <first sentence> → Done`. It showed "Done" for a turn that produced no assistant message and never signalled that the model had been looping for ~2 minutes or that the output was empty. No tool-call count was shown (correctly, since there were none), but "Done" on an empty turn is the indicator lying by omission.
|
||||
- Anything odd (loops, truncation notices, tool errors, effect of the inlet nudge): **Yes — this run is a textbook degenerate repetition loop, and it is the whole story.**
|
||||
- After ~25 lines of genuine reasoning the model entered a two-line cycle and never left it. The repeating unit is the couplet:
|
||||
`Also, 210.52(C)(1) requires at least one receptacle in the garage.` / `Also, 210.52(C)(5)? No, bathrooms.`
|
||||
- Exact counts across the transcript: the string "at least one receptacle in the garage" appears **184** times, "Also, 210.52(C)(5)?" **184** times, "No, bathrooms." **181** times. As standalone paragraph lines the couplet repeats **181 / 180** times. So roughly **180 identical repetitions** of the same two sentences.
|
||||
- The loop begins inside the bulleted "Other requirements" list (first as `- Also, …` bullets, three cycles) and then escapes the list into bare paragraphs, where it runs unbroken to the end.
|
||||
- It **never called a tool** — not once, before, during, or after the loop. The loop is pure self-talk about NEC section numbers it was recalling from memory.
|
||||
- It was cut off mid-sentence at `Also, 210.52(C)(5)?` — the completion ran out (8,201 tokens) rather than the model recovering. There is no explicit truncation notice in the dump; the cut is visible only from the dangling sentence.
|
||||
- **Inlet nudge:** it fires here — the prompt carries "20 A" and "120 V", numbers with units. It made no observable difference: no tool was called and no quantitative reasoning was surfaced to the user. The 13,655 prompt tokens are system prompt + tool schemas + nudge. If anything, this is evidence the nudge alone does not pull this model toward `web_search`.
|
||||
- No tool errors (nothing was invoked). No refusal.
|
||||
|
||||
## Result (fill in)
|
||||
|
||||
- **Score:** 0 / 10
|
||||
- **Breakdown:** correctness 0/5 · calibration 0/2 · tool use 0/2 · communication 0/1 · deductions −2 (floored at 0)
|
||||
- **Verdict:** fail (0–4)
|
||||
- **What it got right:** Nothing that reached the user. For the record, the private reasoning did land two of the three substantive facts before it derailed — "12 AWG copper is standard for a 20A branch circuit" and GFCI "Yes" — and it correctly identified the jurisdiction internally as US NEC. None of it was delivered, so none of it scores.
|
||||
- **What it got wrong:** It produced **no assistant message at all**. The entire 8,201-token completion is one thinking block that fell into a degenerate repetition loop — roughly **180 verbatim repetitions** of the couplet "Also, 210.52(C)(1) requires at least one receptacle in the garage." / "Also, 210.52(C)(5)? No, bathrooms." — burning 137.9 s of decode before running out of tokens mid-sentence at "Also, 210.52(C)(5)?". It called **zero tools**, despite writing "Key points to verify:" as its second line. The NEC clauses it recalled from memory were also materially wrong: it cited **210.8(A)(6)** for detached-garage GFCI (that section is *kitchens*; garages are **210.8(A)(2)**) and **210.52(C)(1)** for the required garage receptacle (that section is *countertop and work-surface* receptacles; garages are **210.52(G)(1)**). It never surfaced 210.11(C)(4) (the dedicated 20 A garage circuit), never mentioned permit/inspection, and never stated the jurisdiction assumption to the user. This is the prompt's central trap — reciting standard clause numbers from memory instead of consulting a source — failed comprehensively, and then compounded by delivering nothing.
|
||||
- **Worth recording in TUNING.md?** **Yes**, two findings, both harness-side rather than pure model slip:
|
||||
1. **No loop/empty-output guard.** A 140 s turn that emits zero assistant text is presented to the user as a normal completed turn. There is no repetition-penalty setting, no max-thinking-token cap, and no retry/regenerate on an empty final message. A `repeat_penalty` / `num_predict` bound on thinking, or a server-side "completion contained no assistant text → regenerate once" rule, would have caught this.
|
||||
2. **The status indicator reported "Done" on an empty turn.** STATUS HISTORY shows `Processing prompt → Thinking → Thought: … → Done` with no warning that the model looped or that nothing was produced. The indicator should distinguish "Done · 0 tool calls · empty response" from a successful answer; as shipped it actively misleads.
|
||||
Secondary, lower-confidence note: the quantitative-question nudge fired (the prompt carries "20 A"/"120 V") and did not move the model toward `web_search` — one data point that the nudge alone is not sufficient to trigger lookups on a code/standards question, though this run's loop makes it impossible to separate nudge failure from decoding failure.
|
||||
|
||||
## Grader notes
|
||||
- Ground truth verification: verified the rubric's NEC facts by web search on 2026-09-11 (grading time). Confirmed all of them: **240.4(D)(5)** caps overcurrent protection on 12 AWG copper at 20 A (small-conductor rule, 18–10 AWG Cu); **210.8(A)(2)** is the garage GFCI section (125 V–250 V receptacles in garages); **210.52(G)(1)** requires at least one receptacle outlet in each vehicle bay of an attached garage and of a detached garage with electric power, not more than 5½ ft above the floor; **210.11(C)(4)** (NEC 2017 onward) requires at least one 120 V, 20 A branch circuit for those garage receptacle outlets; **225.31** requires a disconnecting means for the ungrounded conductors supplying a separate building, and **250.32** requires a grounding electrode system at a separate building fed by a feeder or by a branch circuit over 20 A (with the single-branch-circuit/EGC exception). Also confirmed that the two clauses the model recalled are misassigned: **210.8(A)(6)** is kitchens and **210.52(C)** is countertops/work surfaces. **The rubric's ground truth needed no correction.** Sources: ecmag.com and electricallicenserenewal.com on 240.4(D); captaincode2020/2023.leviton.com and electriciantalk.com on 210.11(C)(4)/210.52(G)(1); stpaul.gov 2023 NEC residential garage checklist and up.codes on 225.31/250.32; wireref.com and electricallicenserenewal.com on 210.8(A)(6)/210.52(C).
|
||||
- Rubric issues: one genuinely ambiguous line, resolved explicitly above — Calibration line 1 says "if it quotes none, full credit for restraint." Taken literally, a run that emits nothing quotes nothing and would earn a free point. I read "restraint" as rewarding a deliberate choice not to assert unverified clause numbers, not an empty output, and scored it 0; the model in fact recalled six-plus clause numbers from memory (two of them wrong) with zero lookups, which is the opposite of restraint. Second, smaller ambiguity: the −2 "quotes an NEC section not present in any tool result" deduction is written against the answer, and there is no answer, so I recorded it as not-applied-but-noted rather than applying it to thinking; the score is 0 either way, so nothing turns on the choice. Finally, the rubric offers no scoring path for "the model produced no output," which is worth adding set-wide — I applied the brief's rule that the answer text is the deliverable and zeroed every line.
|
||||
@@ -0,0 +1,772 @@
|
||||
########################################################################
|
||||
# owuitools prompt test result
|
||||
# prompt dir : easy/e16-garage-circuit-code
|
||||
# chat id : b3fe27b4-3886-4948-9bc5-14ddcfe447ce
|
||||
# chat title : Garage Outlet Wiring
|
||||
# user : the operator
|
||||
# model : qwen3.8:latest
|
||||
# turns : 2 messages on selected branch
|
||||
# tool calls : 0 (none)
|
||||
# dumped at : 2026-09-11T04:44:01Z
|
||||
########################################################################
|
||||
|
||||
=== USER (2026-09-11T04:41:21Z) ===
|
||||
I want to add a 20 A, 120 V circuit for a couple of outlets in my detached garage. What wire gauge do I need, does it need GFCI, and is there anything else the electrical code requires for garage outlets?
|
||||
|
||||
=== ASSISTANT (2026-09-11T04:41:21Z, model qwen3.8:latest) ===
|
||||
usage: prompt_eval_count=13655 eval_count=8201 prompt_tokens=13655 completion_tokens=8201 total=140.3s prefill=2.4s decode=137.9s 59.5 tok/s
|
||||
|
||||
=== [1] THINKING (137s) ===
|
||||
User's question: 20A 120V circuit in a detached garage — wire gauge, GFCI requirements, other NEC requirements for garage outlets.
|
||||
|
||||
This is a residential electrical question in the US (120V, 20A circuit). NEC (NFPA 70) applies. Key points to verify:
|
||||
|
||||
1. Wire gauge for 20A: 12 AWG copper is standard for a 20A branch circuit (NEC 240.4(D) — 12 AWG is limited to 20A).
|
||||
2. GFCI: NEC 210.8(A) — detached garages require GFCI protection for all 125V, 15A and 20A receptacles. Yes.
|
||||
3. Other requirements for garage outlets:
|
||||
- 210.8(A)(6) detached garages
|
||||
- 210.52(C) — garage receptacle placement: at least one receptacle accessible in the garage (210.52(C)(1))
|
||||
- 250.32(A) — detached structures: requires separate grounding electrode / additional grounding electrode for detached structures
|
||||
- 210.52(C)(5)? Actually 210.52(C)(1): garages, attached and detached, shall have at least one receptacle outlet
|
||||
- GFCI in garages: 210.8(A)(6)
|
||||
- Also, if the garage is a detached structure, 250.32(A) requires an additional grounding electrode system
|
||||
- Also, if there is a motor (garage door opener), 210.23(A) — garage door motors are permitted to be 20A? Actually 210.23(A) permits garage door motor loads on 20A circuits.
|
||||
- Also, 210.52(C)(5)? No, that's for bathrooms.
|
||||
- If the garage is a detached structure, 250.32(A) requires an additional grounding electrode system
|
||||
- Also, 210.52(C)(1) requires at least one receptacle in the garage
|
||||
- Also, 210.52(C)(5)? No, that's bathrooms.
|
||||
- Also, 210.52(C)(1) requires at least one receptacle in the garage
|
||||
- Also, 210.52(C)(5)? No, bathrooms.
|
||||
- Also, 210.52(C)(1) requires at least one receptacle in the garage
|
||||
|
||||
Also, if the garage is a detached structure, 250.32(A) requires an additional grounding electrode system.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)? No, bathrooms.
|
||||
|
||||
Also, 210.52(C)(1) requires at least one receptacle in the garage.
|
||||
|
||||
Also, 210.52(C)(5)?
|
||||
|
||||
=== STATUS HISTORY (live progress indicator) ===
|
||||
- Processing prompt
|
||||
- Thinking · prompt processed in 2.6 s
|
||||
- Thought: User's question: 20A 120V circuit in a detached garage — wire gauge, GFCI requirements, other NEC requirements for garage outlets. This is a residential…
|
||||
- Done
|
||||
Reference in New Issue
Block a user