Initial Commit
This commit is contained in:
@@ -0,0 +1,51 @@
|
||||
# h08 — Annuity maths with an interpretation fork
|
||||
|
||||
| | |
|
||||
|---|---|
|
||||
| **Difficulty** | hard |
|
||||
| **Domain** | finance / arithmetic |
|
||||
| **Probes** | `matlab_run` for non-trivial compounding; stating assumptions; recognising that "in today's dollars" has two common readings |
|
||||
| **Tools expected** | `matlab_run` |
|
||||
| **Trap** | Mental arithmetic on (1.005833)^360. Compounding annually (1.07^30) by mistake. Deflating by 30 × 3% linearly. Missing the interpretation fork. |
|
||||
|
||||
## Ground truth (computed with Python, 2026-09-11)
|
||||
|
||||
- FV (ordinary annuity, end of month): 500 × ((1 + 0.07/12)^360 − 1) / (0.07/12) = **$609,985.50**
|
||||
- Annuity-due (start of month) would be $613,543 — acceptable only if the model says it changed the timing.
|
||||
- Contributions **$180,000**; growth **$429,985.50**.
|
||||
- "Today's dollars", reading 1 (deflate the final nominal sum): 609,985.50 / 1.03^30 = 609,985.50 / 2.4273 = **$251,306**.
|
||||
- Reading 2 (contributions held constant in *real* terms, i.e. rising 3%/yr nominally — a real-rate annuity at (1.07/1.03 − 1) = 3.883%): **≈ $339,908**. A different question; must be labelled as such.
|
||||
|
||||
## Scoring (10 points)
|
||||
|
||||
### Correctness (5)
|
||||
- [ ] (2) FV ≈ $610k (accept $609k–$611k; annuity-due $613.5k if the timing change is stated)
|
||||
- [ ] (1) $180k contributed / ~$430k growth
|
||||
- [ ] (1) ≈ $251k deflated (accept $250k–$252k)
|
||||
- [ ] (1) Names the second interpretation (real-rate / contributions indexed to inflation) or the annuity-due timing fork, with a number or at least the direction
|
||||
|
||||
### Calibration & honesty (2)
|
||||
- [ ] (1) Assumptions stated: end-of-month, 7%/12 monthly, 3% deflator, no fees/taxes
|
||||
- [ ] (1) Rates framed as assumptions, no prediction or advice language
|
||||
|
||||
### Tool use (2)
|
||||
- [ ] (2) `matlab_run`. 1 if closed-form formula shown by hand with a correct result. 0 if mental with an error.
|
||||
|
||||
### Communication (1)
|
||||
- [ ] (1) Three numbers up front, then the interpretation note
|
||||
|
||||
### Automatic deductions
|
||||
- −2 FV off by more than 2%
|
||||
- −2 annual compounding (1.07^30)
|
||||
- −1 deflates linearly (30 × 3%)
|
||||
- −1 intent-without-call
|
||||
- automatic fail
|
||||
|
||||
## Grading
|
||||
|
||||
One worksheet per round, alongside that round's transcript:
|
||||
|
||||
- `v1/grade.md` · `v1/result.txt` — first round (baseline)
|
||||
- `v2/grade.md` · `v2/result.txt` — second round
|
||||
|
||||
Copy the scoring skeleton above into a new round's `grade.md` to add one.
|
||||
Reference in New Issue
Block a user